Construction of Mega civil and mechanical works (including piping, steel structure, plant / facility Installation and Tank repair / construction)
Civil and Mechanical Maintenance Works (including Refinery Shutdown and General Turnarounds)
Special Coating and Industrial Painting for Tanks and pipelines. Including internal HDPE lining (Roll Down Tight Fit – Slip Lining, Pipe in a Pipe)
AdvancedScaffolding works through modern scaffolding technology from Spain which saves more than 40% of scaffolding material and more than 50% of erection and installation time.